Projects
L
MILLAR & ASSOCIATES
From 1992
- Traffic Safety and Road Safety
Audits
- Traffic Engineering
- Transport Planning
- Parking Studies
- Traffic Signals, Signs and
Pavement Markings
- Railway Level Crossings
Traffic
Safety and Road Safety Audits
Road
safety audit team leader on the following major Perth metropolitan road construction projects:
- Victoria Park Drive
Modifications (Arup, Lend Lease). Preliminary, detailed design and
traffic management road safety audits.
- Gateway WA Perth Airport
and Freight Access Project (Gateway WA). Preliminary and detailed design
road safety audits.
- Mitchell Freeway Widening,
Graham Farmer Freeway to Hutton Street (Abigroup). Preliminary and detailed design
road safety audits.
- Great Eastern Highway
Upgrade, Kooyong Road to Tonkin Highway (City East Alliance). Preliminary, detailed design
and post construction road safety audits.
- Great Eastern Highway/Roe
Highway Interchange (BG&E/Macmahon). Preliminary, detailed design,
traffic management and post construction road safety audits.
- Riverside Project, East
Perth (Arup/EPRA). Design
road safety audits.
- Reid Highway/Alexander
Drive and Reid Highway/Mirrabooka Avenue Interchanges
(KBR/Abigroup).
Preliminary, detailed design, traffic management and post
construction road safety audits.
- Reid Highway, West Swan
Road to GNH (BG&E/Macmahon).
Preliminary, detailed design, traffic management and post
construction road safety audits.
- New Perth Bunbury Highway
Project and Mandurah Entrance Road (Southern Gateway Alliance). Preliminary, detailed design,
traffic management and post construction road safety audits.
- Mitchell Freeway Extension,
Hodges Drive to Burns Beach Road (BG&E/Macmahon). Preliminary, detailed design,
traffic management and post construction road safety audits.
- Roe Highway Stage 7 (Roe 7
Alliance). Traffic
management and post construction road safety audits.
- New MetroRail City Project
(Package F between the Narrows Bridge and Roe Street through the Perth
CBD.) (Leighton Kumagai Joint Venture). Preliminary, detailed design,
traffic management and post construction road safety audits.
- SWMR Package E for Kwinana
Freeway, interchanges and shared paths between the Narrows Bridge and
Farrington Road (GHD/Leighton Contractors). Preliminary, detailed design,
traffic management and post construction road safety audits.
- Tonkin Highway Extension,
Mills Road West to Thomas Road (KBR/John Holland Macmahon Joint
Venture). Preliminary,
detailed design, traffic management and post construction road safety
audits.
- Roe Highway Stage 6,
(KBR/Transfield Macmahon Joint Venture). Preliminary, detailed design,
traffic management and post construction road safety audits.
Road
safety audit team leader on the following major rural road construction projects:
- Great Eastern Highway,
Bullabulling to Coolgardie (BG&E, Brierty). Design and traffic management
road safety audits.
- Great North Highway
Realignment, Port Hedland (BG&E, John Holland). Design, traffic management and
pre-opening and post-opening road safety audits.
- Bunbury Port Access Project
Stage 2 (KBR/Fulton Hogan).
Design and pre-opening and post-opening road safety audits.
- Indian Ocean Drive Stage 2
(Main Roads WA).
Pre-opening and post opening road safety audits.
- Bunbury Port Access Road
Stage 1 (AECOM/Main Roads WA). Design and post construction
road safety audits.
- Geraldton Southern
Transport Corridor Stage 2 (SKM/Abigroup). Design and post construction
road safety audits.
- Great Northern Highway
Kimberly Project (Team Savannah). Design, traffic management and post
construction road safety audits
- Great Eastern Highway,
Tammin to Walgoolan Project (Aline East Alliance). Design and post construction
road safety audits.
- Karratha-Tom Price, Stage 2
(Millstream Link). Design
and post construction road safety audits.
- Eyre Highway, Balladonia
and Caiguna East sections (KBR).
Design road safety audits.
Road
safety audit team leader on the following Road Planning projects:
- Roe Highway Extension (Roe
8), Kwinana Freeway to Stock Road (South Metro Connect). Preliminary design road safety
audit.
- Henley Brook Avenue Road
Reservation Review (WorleyParsons). Concept design audit.
- Canning Highway Road
Reservation Review, Albany Highway to Kwinana Freeway
(WorleyParsons). Concept
design audit.
Road
safety audit team leader on the following Light Rail Transit projects:
- Mirrabooka Interchange and
Yirrigan Drive LRT Study (Parsons Brinckerhoff). Concept design road safety
audit.
- Perth Inner City Light Rail
Project Perth Eastern Section between Victoria Park and Curtin
University (Parsons Brinckerhoff). Concept design road safety
audit.
- Perth Inner City Light Rail
Project Perth Central Section between the University of WA and
Victoria Park (Parsons Brinckerhoff). Concept design road safety
audit.
to top
Traffic
Engineering
·
Reid
Highway/Alexander Road Interchange (Main Roads). Determined lane configuration for
Main Roads during the pre-tender stage.
·
Leach
Highway/Orrong Road Interchange (Main Roads and John Holland). Determined lane configuration for
Main Roads during the pre-tender stage and later confirmed turn lane
lengths and signal phasing for John Holland.
·
Roe
Highway Stage 6, Nicholson Road to South Street (Main Roads WA). Determined lane configurations for
interchanges and adjoining intersections on Willeri Drive and South Street. Assessed traffic impacts on the
adjoining road system.
·
Roe
Highway Stages 4 and 5, Welshpool Road to Nicholson Road (Main Roads WA and
City of Canning). Analysed
traffic forecast data and produced lane configurations for interchanges and
various intersections on Orrong Road, Welshpool Road, and Nicholson Road.
·
Roe
Highway Stages 4/5, Welshpool Road to Nicholson Road (Bruechle Gilchrist
& Evans/Main Roads).
Provided technical advice to Main Roads in traffic safety, safety
barriers, shared paths, traffic management, intersection operation and
traffic signs.
·
Rockingham,
Waikiki and Mandurah Stations; Package C (JCY/New MetroRail). Main traffic engineering consultant
for the design and documentation of the Rockingham, Waikiki and Mandurah
Stations to be constructed for the Perth-Mandurah railway. Involves analysis and design of
roads, car parks and shared paths for cars, buses, pedestrians and
cyclists.
to top
Transport
Planning
·
Orrong
Road Planning Review (Department of Planning). Preparation of briefs and ongoing
project management for future planning of Orrong Road.
- Stephenson Highway Review (Department of
Transport). Carried out traffic modelling and assessment as part of a
study to examined the possible removal of all or part of the
Stephenson Highway reservation between West Coast Highway and Osborne
Park.
- Fremantle to Cottesloe Transport Plan (Department
of Transport). Analysis of road proposals for the Fremantle to
Cottesloe Transport Plan between Tydeman Road and Wellington Street.
- Araluen Park Strategic Review (Department of
Planning and Infrastructure). Transport study to address roads,
traffic and parking issues for the park and adjacent land and
recommend improvements that are required for its future development.
- Tonkin Highway/Roe Highway Abernethy Road
Interchange (Main Roads WA/Egis Consulting). Prepared a planning
report describing the revisions to the interchange configuration that
can be used as a basis for an amendment to the Metropolitan Region
Scheme.
- Metropolitan Regional Network Plan, 2001/02 to
20010/11 (Main Roads WA). Prepared the report on the Regional Network
Plan for the Perth Region containing the future funding requirements
to manage the National Highway and State Road system over the next 10
years.
- Paramics Model Reviews (Main Roads WA). Reviewed
traffic planning reports prepared using the Paramics model by HGM on
the Armadale Redevelopment Area and by Sinclair Knight Merz on Reid
Highway through Carine.
to top
Parking
Studies
- St John's Superlot, Northbridge (East Perth
Redevelopment Authority/Sinclair Knight Merz). Parking and traffic
study to assess the parking requirements on the St John's Superlot and
the potential to install embayed parking along Newcastle Street.
- Northbridge Parking and Access Study (City of
Perth/Sinclair Knight Merz). Prepared and evaluated alternative
parking and access strategies to serve the needs of Northbridge.
- East Perth Redevelopment Area Parking Strategy
(East Perth Redevelopment Authority/Sinclair Knight Merz). Prepared a
strategy which addressed the location and size of future off-street
public site public car parks and on-street parking restrictions.
Amendments to the Redevelopment Scheme and Policies were also included
as part of the strategy proposals.
- East
Perth Major Sporting Facilities Parking and Access Study (East Perth
Redevelopment Authority). Project Manager responsible for coordinating
a study into parking requirements for the WACA and Gloucester Park.
to top
Traffic Signals, Signs and Pavement
Markings
- Gateway WA Perth Airport and Freight Access Project
(Gateway WA). Prepared
guide signing scheme and designed all direction signs associated with
the contract works.
- Great Eastern Highway Upgrade, Kooyong Road to
Tonkin Highway (City East Alliance). Prepared guide signing scheme
and reviewed all direction signs associated with the contract works.
- Great Eastern Highway/Roe Highway Interchange
(BG&E/Macmahon).
Prepared guide signing scheme and designed all direction signs
associated with the contract works.
- Reid Highway, West Swan Road to GNH
(BG&E/Macmahon).
Prepared guide signing scheme and designed all direction signs
associated with the contract works.
- Mitchell Freeway, Hodges Drive to Burns Beach Road
(BG&E/Macmahon).
Prepared guide signing scheme and designed all direction signs
associated with the contract works.
- Tonkin Highway Extension (KBR/Macmahon). Prepared guide signing scheme
and designed all direction signs associated with the contract works.
- Roe Highway Stage 6 (KBR/Macmahon). Prepared guide signing scheme
and designed direction signs associated with the contract works.
- Geraldton Southern Transport Corridor Stages 1 and
2 (BG&E/Theiss and BG&E/Abigroup). Prepared guide signing scheme
and designed all direction signs associated with the contract works.
- Direction Sign Operational Guidelines (Main Roads
WA). Prepared operational
guidelines for direction signs in the Perth metropolitan and rural
areas. The guidelines
described the selection of destination and route names, types of
direction signs and sign layout and were developed following an
examination of signing practices used in Australia and overseas.
- Service and Tourist Signs (Main Roads WA). Prepared policies and guideline
on service and tourist signs.
to top
Railway
Level Crossings
- Railway Crossing Protection in WA Policy and
Guidelines (Main Roads WA). Prepared and revised various sections in
the manual.
- Railway Crossing Investigations (Main Roads WA).
Carried out a crash investigation, a review of the level of protection
and signs and a safety audit at railway crossings on South Coast
Highway, Esperance; Yarramony Road, Northam; Great Eastern Highway,
Merredin; Lennard Street, Herne Hill; Denny Avenue, Kelmscott;
Lymburner Road, Wagin; South Western Highway, Albany; York-Williams Road,
Beverley; Sandalwood Road, Benger; Mornington Road, Wokalup; King
Road, Oldbury; Armadale Road, Armadale; and Toodyay-Bindi Bindi Road,
Bindi Bind.