Projects

L MILLAR & ASSOCIATES
From 1992

  1. Traffic Safety and Road Safety Audits
  2. Traffic Engineering
  3. Transport Planning
  4. Parking Studies
  5. Traffic Signals, Signs and Pavement Markings
  6. Railway Level Crossings

Traffic Safety and Road Safety Audits

Road safety audit team leader on the following major Perth metropolitan road construction projects:

  • Victoria Park Drive Modifications (Arup, Lend Lease). Preliminary, detailed design and traffic management road safety audits.
  • Gateway WA Perth Airport and Freight Access Project (Gateway WA).  Preliminary and detailed design road safety audits.
  • Mitchell Freeway Widening, Graham Farmer Freeway to Hutton Street (Abigroup).  Preliminary and detailed design road safety audits.
  • Great Eastern Highway Upgrade, Kooyong Road to Tonkin Highway (City East Alliance).  Preliminary, detailed design and post construction road safety audits.
  • Great Eastern Highway/Roe Highway Interchange (BG&E/Macmahon).  Preliminary, detailed design, traffic management and post construction road safety audits.
  • Riverside Project, East Perth (Arup/EPRA).  Design road safety audits.
  • Reid Highway/Alexander Drive and Reid Highway/Mirrabooka Avenue Interchanges (KBR/Abigroup).  Preliminary, detailed design, traffic management and post construction road safety audits.
  • Reid Highway, West Swan Road to GNH (BG&E/Macmahon).  Preliminary, detailed design, traffic management and post construction road safety audits.
  • New Perth Bunbury Highway Project and Mandurah Entrance Road (Southern Gateway Alliance).  Preliminary, detailed design, traffic management and post construction road safety audits.
  • Mitchell Freeway Extension, Hodges Drive to Burns Beach Road (BG&E/Macmahon).  Preliminary, detailed design, traffic management and post construction road safety audits.
  • Roe Highway Stage 7 (Roe 7 Alliance).  Traffic management and post construction road safety audits.
  • New MetroRail City Project (Package F between the Narrows Bridge and Roe Street through the Perth CBD.) (Leighton Kumagai Joint Venture).  Preliminary, detailed design, traffic management and post construction road safety audits.
  • SWMR Package E for Kwinana Freeway, interchanges and shared paths between the Narrows Bridge and Farrington Road (GHD/Leighton Contractors).  Preliminary, detailed design, traffic management and post construction road safety audits.
  • Tonkin Highway Extension, Mills Road West to Thomas Road (KBR/John Holland Macmahon Joint Venture).  Preliminary, detailed design, traffic management and post construction road safety audits.
  • Roe Highway Stage 6, (KBR/Transfield Macmahon Joint Venture).  Preliminary, detailed design, traffic management and post construction road safety audits.

 

Road safety audit team leader on the following major rural road construction projects:

  • Great Eastern Highway, Bullabulling to Coolgardie (BG&E, Brierty).  Design and traffic management road safety audits.
  • Great North Highway Realignment, Port Hedland (BG&E, John Holland).  Design, traffic management and pre-opening and post-opening road safety audits.
  • Bunbury Port Access Project Stage 2 (KBR/Fulton Hogan).  Design and pre-opening and post-opening road safety audits.
  • Indian Ocean Drive Stage 2 (Main Roads WA).  Pre-opening and post opening road safety audits.
  • Bunbury Port Access Road Stage 1 (AECOM/Main Roads WA).  Design and post construction road safety audits.
  • Geraldton Southern Transport Corridor Stage 2 (SKM/Abigroup).  Design and post construction road safety audits.
  • Great Northern Highway Kimberly Project (Team Savannah). Design, traffic management and post construction road safety audits
  • Great Eastern Highway, Tammin to Walgoolan Project (Aline East Alliance).  Design and post construction road safety audits.
  • Karratha-Tom Price, Stage 2 (Millstream Link).  Design and post construction road safety audits.
  • Eyre Highway, Balladonia and Caiguna East sections (KBR).  Design road safety audits.

 

Road safety audit team leader on the following Road Planning projects:

  • Roe Highway Extension (Roe 8), Kwinana Freeway to Stock Road (South Metro Connect).  Preliminary design road safety audit.
  • Henley Brook Avenue Road Reservation Review (WorleyParsons).  Concept design audit.
  • Canning Highway Road Reservation Review, Albany Highway to Kwinana Freeway (WorleyParsons).  Concept design audit.

 

Road safety audit team leader on the following Light Rail Transit projects:

  • Mirrabooka Interchange and Yirrigan Drive LRT Study (Parsons Brinckerhoff).  Concept design road safety audit.
  • Perth Inner City Light Rail Project Perth Eastern Section between Victoria Park and Curtin University (Parsons Brinckerhoff).  Concept design road safety audit.
  • Perth Inner City Light Rail Project Perth Central Section between the University of WA and Victoria Park (Parsons Brinckerhoff).  Concept design road safety audit.

    to top

Traffic Engineering

·        Reid Highway/Alexander Road Interchange (Main Roads).  Determined lane configuration for Main Roads during the pre-tender stage.

·        Leach Highway/Orrong Road Interchange (Main Roads and John Holland).  Determined lane configuration for Main Roads during the pre-tender stage and later confirmed turn lane lengths and signal phasing for John Holland.

·        Roe Highway Stage 6, Nicholson Road to South Street (Main Roads WA).  Determined lane configurations for interchanges and adjoining intersections on Willeri Drive and South Street.  Assessed traffic impacts on the adjoining road system.

·        Roe Highway Stages 4 and 5, Welshpool Road to Nicholson Road (Main Roads WA and City of Canning).  Analysed traffic forecast data and produced lane configurations for interchanges and various intersections on Orrong Road, Welshpool Road, and Nicholson Road.

·        Roe Highway Stages 4/5, Welshpool Road to Nicholson Road (Bruechle Gilchrist & Evans/Main Roads).  Provided technical advice to Main Roads in traffic safety, safety barriers, shared paths, traffic management, intersection operation and traffic signs.

·        Rockingham, Waikiki and Mandurah Stations; Package C (JCY/New MetroRail).  Main traffic engineering consultant for the design and documentation of the Rockingham, Waikiki and Mandurah Stations to be constructed for the Perth-Mandurah railway.  Involves analysis and design of roads, car parks and shared paths for cars, buses, pedestrians and cyclists.

to top

Transport Planning

·        Orrong Road Planning Review (Department of Planning).  Preparation of briefs and ongoing project management for future planning of Orrong Road.

  • Stephenson Highway Review (Department of Transport). Carried out traffic modelling and assessment as part of a study to examined the possible removal of all or part of the Stephenson Highway reservation between West Coast Highway and Osborne Park.
  • Fremantle to Cottesloe Transport Plan (Department of Transport). Analysis of road proposals for the Fremantle to Cottesloe Transport Plan between Tydeman Road and Wellington Street.
  • Araluen Park Strategic Review (Department of Planning and Infrastructure). Transport study to address roads, traffic and parking issues for the park and adjacent land and recommend improvements that are required for its future development.
  • Tonkin Highway/Roe Highway Abernethy Road Interchange (Main Roads WA/Egis Consulting). Prepared a planning report describing the revisions to the interchange configuration that can be used as a basis for an amendment to the Metropolitan Region Scheme.
  • Metropolitan Regional Network Plan, 2001/02 to 20010/11 (Main Roads WA). Prepared the report on the Regional Network Plan for the Perth Region containing the future funding requirements to manage the National Highway and State Road system over the next 10 years.
  • Paramics Model Reviews (Main Roads WA). Reviewed traffic planning reports prepared using the Paramics model by HGM on the Armadale Redevelopment Area and by Sinclair Knight Merz on Reid Highway through Carine.

    to top

Parking Studies

  • St John's Superlot, Northbridge (East Perth Redevelopment Authority/Sinclair Knight Merz). Parking and traffic study to assess the parking requirements on the St John's Superlot and the potential to install embayed parking along Newcastle Street.
  • Northbridge Parking and Access Study (City of Perth/Sinclair Knight Merz). Prepared and evaluated alternative parking and access strategies to serve the needs of Northbridge.
  • East Perth Redevelopment Area Parking Strategy (East Perth Redevelopment Authority/Sinclair Knight Merz). Prepared a strategy which addressed the location and size of future off-street public site public car parks and on-street parking restrictions. Amendments to the Redevelopment Scheme and Policies were also included as part of the strategy proposals.
  • East Perth Major Sporting Facilities Parking and Access Study (East Perth Redevelopment Authority). Project Manager responsible for coordinating a study into parking requirements for the WACA and Gloucester Park.

    to top

Traffic Signals, Signs and Pavement Markings

  • Gateway WA Perth Airport and Freight Access Project (Gateway WA).  Prepared guide signing scheme and designed all direction signs associated with the contract works.
  • Great Eastern Highway Upgrade, Kooyong Road to Tonkin Highway (City East Alliance).  Prepared guide signing scheme and reviewed all direction signs associated with the contract works.
  • Great Eastern Highway/Roe Highway Interchange (BG&E/Macmahon).  Prepared guide signing scheme and designed all direction signs associated with the contract works.
  • Reid Highway, West Swan Road to GNH (BG&E/Macmahon).  Prepared guide signing scheme and designed all direction signs associated with the contract works.
  • Mitchell Freeway, Hodges Drive to Burns Beach Road (BG&E/Macmahon).  Prepared guide signing scheme and designed all direction signs associated with the contract works.
  • Tonkin Highway Extension (KBR/Macmahon).  Prepared guide signing scheme and designed all direction signs associated with the contract works.
  • Roe Highway Stage 6 (KBR/Macmahon).  Prepared guide signing scheme and designed direction signs associated with the contract works.
  • Geraldton Southern Transport Corridor Stages 1 and 2 (BG&E/Theiss and BG&E/Abigroup).  Prepared guide signing scheme and designed all direction signs associated with the contract works.
  • Direction Sign Operational Guidelines (Main Roads WA).  Prepared operational guidelines for direction signs in the Perth metropolitan and rural areas.  The guidelines described the selection of destination and route names, types of direction signs and sign layout and were developed following an examination of signing practices used in Australia and overseas.
  • Service and Tourist Signs (Main Roads WA).  Prepared policies and guideline on service and tourist signs.

    to top


Railway Level Crossings

  • Railway Crossing Protection in WA Policy and Guidelines (Main Roads WA). Prepared and revised various sections in the manual.
  • Railway Crossing Investigations (Main Roads WA). Carried out a crash investigation, a review of the level of protection and signs and a safety audit at railway crossings on South Coast Highway, Esperance; Yarramony Road, Northam; Great Eastern Highway, Merredin; Lennard Street, Herne Hill; Denny Avenue, Kelmscott; Lymburner Road, Wagin; South Western Highway, Albany; York-Williams Road, Beverley; Sandalwood Road, Benger; Mornington Road, Wokalup; King Road, Oldbury; Armadale Road, Armadale; and Toodyay-Bindi Bindi Road, Bindi Bind.