Construction Engineering - Prince George | Allnorth

Replacement of the Cameron Street bridge in Prince George, BC, involved demolition of the existing timber Howe truss bridge superstructure, reconstruction of the existing pier caps, construction of new abutments and installation of a new 4 span, 187 m long, steel girder, two lane bridge.

IDL Projects Inc. (IDL) engaged Allnorth to provide construction engineering services for the project. These services included conceptual and detailed designs, liaison with the bridge designers, plus construction inspections and supervision. An innovative approach was developed for the demolition and launch procedure by utilizing the existing timber bridge to launch the new superstructure. During the launch, each span of the existing truss was “picked-up” and dismantled piece by piece to meet the contract salvage requirements.

Find an office near you

With locations across Canada and into the US and Mexico, Allnorth prides itself on being responsive to client needs and to providing leading-edge methodologies, technologies and protocols. Having a local presence helps us build strong relationships, and working cross functionally throughout the company helps us leverage the strengths of our entire team to deliver successful client solutions. Contact us today for more information as to how we can work together for you.

Learn More