Technical guidelines

Technical guidelines

To support your Feed-in Tariff application, you must observe all of the technical guidelines and document required listed on this page.

Note:

Please click here (PDF) for major updates of technical documents.

Document
Details

Outlines the design requirements and considerations for:

  • Inverter-based RE Systems with generation capacity of up to 1MW; and 
  • Non-inverter-based RE Systems with generation capacity of up to 200kW.

Sets out the general technical requirements for the parallel connection of your RE systems connecting to CLP’s 11 kV or 380V system.

Sets out the requirements for the location, accommodation and operation of:

  • FiT meters; and 
  • Electricity revenue meters.

Sample of consent form for electrical installation works (for village houses or small houses; for high rise buildings) (if applicable) (PDF)

Prepare this document for your online application.

Submit this document for your test and installation for RE system with generation capacity of over 200kW.

Submit this document for your test and installation.

Back to top