To support your Feed-in Tariff application, you must observe all of the technical guidelines and document required listed on this page.
Please click here (PDF) for major updates of technical documents.
Outlines the design requirements and considerations for:
Sets out the general technical requirements for the parallel connection of your RE systems connecting to CLP’s 11 kV or 380V system.
Sets out the requirements for the location, accommodation and operation of:
Prepare this document for your online application.
Prepare this document for your online application.
Sample of consent form for electrical installation works (for village houses or small houses; for high rise buildings) (if applicable) (PDF)
Prepare this document for your online application.
Sample of video showing the independent stair/access route to the RE systems and the FiT meter (if applicable)
Prepare this document for your online application.
Submit this document for your technical assessment.
Submit this document for your test and installation.
Submit this document for your test and installation for RE system with generation capacity of over 200kW.
FiT Project Cost Form (PDF)
Submit this document for your test and installation.