WYDOT Travel Information Service
Search another route:           

Travel information for Interstate 80 is as follows:

Last update at: Jun 5, 2024, 01:11 AM

New Feature


Frequently Asked Questions Closures & Advisories
Search Conditions By Map
Search By City
Search By District
Variable Speed Limits
Chain Law
Neighboring States

District Comments
District 1 (Southeast)
District 3 (Southwest) US 26/89/191: PLANNED CONSTRUCTION at milepost 184 in Grand Teton Nat'l Park on June 3rd and 4th from 8am-8pm. Expect 30 minute delays.

WY22: Weight Limit of 60,000 GVW is in effect over Teton Pass between Jackson and the Idaho state line from milepost 7 to 17.

US30: Watch for Falling Rock between Kemmerer and Cokeville from milepost 36 to 38.



Conditions
Nearest Town Location Conditions Advisories Restrictions Last Report Time Cameras Sensors
Evanston
NWS Forecast
EASTBOUND between the Utah State Line and Evanston Dry None I 80 , US 189 from milepost 4.400 to 4.600
Width restriction: 18 ft
Jun 5, 2024, 01:02 AM    
WESTBOUND between the Utah State Line and Evanston Dry None None Jun 5, 2024, 01:02 AM    
Between Evanston and Exit 18, US 189 Dry None None Jun 5, 2024, 01:02 AM    
Between Exit 18, US 189 and Exit 30, Bigelow Rd Dry None None Jun 5, 2024, 01:02 AM    
Lyman
NWS Forecast
Between Exit 30, Bigelow Rd and Exit 39, WY 412/414 Dry None None Jun 5, 2024, 01:02 AM    
Between Exit 39, WY 412/414 and MM 57, Sweetwater County Line Dry None None Jun 5, 2024, 01:02 AM    
Granger
NWS Forecast
Between MM 57, Uinta County Line and Exit 66, Granger Jct Dry None None Jun 5, 2024, 01:02 AM    
Between Exit 66, Granger Jct and Exit 83, La Barge Rd Dry None None Jun 5, 2024, 01:02 AM    
Rock Springs
NWS Forecast
Between Exit 83, La Barge Rd and Exit 91, Flaming Gorge Way Dry None None Jun 5, 2024, 01:02 AM    
Between Exit 91, Flaming Gorge Way and Exit 104, Rock Springs Dry None None Jun 5, 2024, 01:02 AM    
Between Exit 104, Rock Springs and Exit 111, Airport and Baxter Roads Dry None None Jun 5, 2024, 01:02 AM    
Between Exit 111, Airport and Baxter Roads and Point of Rocks Dry None None Jun 5, 2024, 01:02 AM    
Patrick Draw
NWS Forecast
Between Point of Rocks and Exit 142, Bitter Creek Dry None None Jun 5, 2024, 01:02 AM    
Between Exit 142, Bitter Creek and Exit 158, Tipton Rd Dry None None Jun 5, 2024, 01:02 AM    
Wamsutter
NWS Forecast
Between Exit 158, Tipton Rd and Wamsutter Dry None None Jun 5, 2024, 01:02 AM    
Between Wamsutter and Exit 187, Creston Jct Dry None None Jun 5, 2024, 01:02 AM    
Rawlins
NWS Forecast
Between Exit 187, Creston Jct and Rawlins Dry None None Jun 5, 2024, 01:11 AM    
Between Rawlins and Exit 235, Walcott Jct Dry None None Jun 5, 2024, 01:11 AM    
Elk Mountain
NWS Forecast
Between Exit 235, Walcott Jct and Exit 255, WY 72 Dry with Strong Winds None None Jun 5, 2024, 01:11 AM    
Between Exit 255, WY 72 and Exit 267, Wagonhound Rd Dry with Strong Winds None None Jun 5, 2024, 01:11 AM    
Arlington
NWS Forecast
Between Exit 267, Wagonhound Rd and Arlington Dry with Strong Winds None None Jun 5, 2024, 01:11 AM    
Between Arlington and Exit 279, Cooper Cove Rd Dry with Strong Winds None None Jun 5, 2024, 01:11 AM    
Laramie
NWS Forecast
Between Exit 279, Cooper Cove Rd and Exit 290, Quealy Dome Dry with Strong Winds None None Jun 5, 2024, 01:11 AM    
Between Exit 290, Quealy Dome and Laramie Dry None None Jun 5, 2024, 01:11 AM    
Between Laramie and Exit 323, Happy Jack Rd Dry None None Jun 5, 2024, 01:11 AM    
Between Exit 323, Happy Jack Rd and Exit 335, Buford Dry None None Jun 5, 2024, 01:11 AM    
Cheyenne
NWS Forecast
Between Exit 335, Buford and Exit 348, Otto Rd Dry None None Jun 5, 2024, 01:11 AM    
EASTBOUND between Exit 348, Otto Rd and Exit 359, Junction I-25 Dry None None Jun 5, 2024, 01:11 AM    
WESTBOUND between Exit 348, Otto Rd and Exit 359, Junction I-25 Dry None I 80 , US 30 from milepost 357.600 to 362.100
Width restriction: 14 ft
Jun 5, 2024, 01:11 AM    
EASTBOUND between Exit 359, Junction I-25 and Exit 364, College Drive Dry None None Jun 5, 2024, 01:11 AM    
WESTBOUND between Exit 359, Junction I-25 and Exit 364, College Drive Dry None I 80 , US 30 from milepost 357.600 to 362.100
Width restriction: 14 ft
Jun 5, 2024, 01:11 AM    
Between Exit 364, College Drive and Exit 370, Archer Interchange Dry None None Jun 5, 2024, 01:11 AM    
Between Exit 370, Archer Interchange and Exit 377, WY 217 Dry None None Jun 5, 2024, 01:11 AM    
Pine Bluffs
NWS Forecast
Between Exit 377, WY 217 and Pine Bluffs Dry None I 80 , US 30 from milepost 393.400 to 400.500
Width restriction: 16 ft
Jun 5, 2024, 01:11 AM    
Between Pine Bluffs and the Nebraska State Line Dry None None Jun 5, 2024, 01:11 AM    

Construction Projects
Project Name Project Number WYDOT Contact Contractor Contact Start Date Completion Date Description Road Milepost(s) Surface Delays Last Updated
Bridge Damage Repair I-80 both dir mp 360.39 - 364 near Cheyenne I806216 Craig Cox
777-4404
Reiman Corp. and Subsidiary
Cheyenne , WY
307-632-8971
Sep 26, 2023 Jun 29, 2024 Structure, traffic control, bituminous surfacing, surfacing, and miscellaneous work. 360.390 to 364.000 Paved Expect delays Jun 4, 2024, 11:31 AM
Roadwork near Cheyenne I-80 MP 357.66-362 both dir I806211 Craig Cox
777-4404
Simon Contractors and Subsidiaries
Cheyenne , WY
307-632-7900
Mar 19, 2023 Aug 30, 2024 Bituminous surfacing, concrete surfacing, traffic control, bridge rehabilitation, milling and miscellaneous work 357.660 to 362.000 Paved Expect delays Apr 18, 2024, 09:15 AM
D1 Contract Patching, I-80 MP 327.35-327.4, Curtis St. I-80 Bus. Loop MP .44-1.04 STP-PM-B241011, STP-BR-B241014 Steven Cook
307-745-2115
steve.cook@wyo.gov
S & S Builders, LLC
Gillette , WY
307-686-5659
Apr 7, 2024 Oct 30, 2024 Contract Patch, Slab Repair and Bridge Rehabilitation involving bridge rehabilitation, asphalt paving, concrete paving, milling and traffic control work on approximately 0.90 miles at various locations at the I-80 Bus Loop near Laramie in Transportation District Added 4/5/24 BLH 327.350 to 327.400 Paved Construction zone speed limit 20 MPH Apr 18, 2024, 09:00 AM
District 1 Bridge Rehabilitation near Laramie mp 299 - 302 STP-BR-B241001 Kory Cramer
307-745-2137
Reiman Corp. and Subsidiary
Cheyenne , WY
307-632-8971
Apr 14, 2024 Oct 30, 2024 Bridge Rehabilitation involving structure, traffic control, asphalt paving, and milling work at various locations in Transportation District 1. 302.000 to 302.100 Paved None Apr 16, 2024, 04:15 AM
Roadwork I-80 EB mp 258 - 267 near Elk Mountain NHPPI-I804263 Aaron Spenny
328-4104 or 321-6517
Simon Contractors - Laramie
Laramie , WY
307-760-4022
Apr 1, 2024 Jun 29, 2024 Mill, Overlay and High Performance Wearing Course with some Concrete Slab Replacements in the driving lane on 8.40 miles in the east bound lane (only). Traffic will be slowed down to 45 mph where workers are present, Traffic will be slowed down to 65 mph throughout. 258.000 to 267.000 Paved Right lane closed May 29, 2024, 12:09 AM
Roadwork I-80 milepost 104-108 Both Directions near Rock Springs AML Remediation None Nucor, Inc.
Riverton , WY
307-856-1577
Apr 14, 2024 Oct 30, 2024 Drilling and grouting on roadway surface with single lane closures 105.000 to 108.000 Paved Right lane closed Apr 23, 2024, 03:32 AM
Striping Operation I-80 both directions mp 83- 163 between Granger and Wamsutter HSIP-B233028 Brad McCullough
352-3036(c) 522-8948
Streamline Markings, Inc.
Billings , MT
406-252-3546
May 27, 2024 Jun 29, 2024 Striping operation at various locations along I-80 between milepost 83 and milepost 163. Expect lane closures and reduced speed in active work zones. 83.000 to 163.000 Paved Expect delays May 28, 2024, 07:38 AM
Roadwork near Granger I-80 mp 57-65 Both dir I802206 Clint- Office Lockman
307-352-3039
Lewis & Lewis Inc.
Rock Springs , WY
307-362-7948
Apr 14, 2024 Oct 30, 2025 Milling and paving with minor pipe work. Traffic will be reduced to 45 mph at various locations. Traffic will be head to head. 57.000 to 65.000 Paved Construction zone speed limit 45 MPH Apr 24, 2024, 12:01 AM
Bridge damage I-80 EB mp 4.5 near Evanston Evanston Bridge Damage None None Apr 30, 2024 Jun 30, 2024 Bridge damage repair and miscellaneous work near Evanston 4.300 to 4.700 Paved Left lane closed May 28, 2024, 05:51 AM
*Chain Law - Level 1 Definition
**Chain Law - Level 2 Definition
Other Definitions

Impact Levels Description / Recommended Action
Low Minimal impacts expected, use general caution.
Moderate Some impacts expected, use extra caution. Stay alert for changing road and weather conditions.
High Dangerous impacts expected, use extreme caution, delay travel or consider alternate route. If travel is necessary, slow down and allow extra time.
CLOSED Per W.S. 24-1-109, motorists traveling on a closed road without permission from WYDOT or WHP may be subject to a fine of up to $750 and/or up to 30 days imprisonment.
Seasonal / Long-Duration Event Impact level used to distinguish long-duration events from emergent events.
All travelers are encouraged to check present conditions and forecasts before departing.